Get Latest Updates Join Now

Govt Plans Toll Booth Removal on Highways: New Update for October 2025

In a significant move aimed at improving road efficiency and reducing congestion, the Indian government is working on a progressive highway toll removal plan India, which could be rolled out by October 2025. As part of this bold infrastructure strategy, several toll booths on key stretches of national highways may be phased out and replaced by digital toll collection systems.

This major national highways update is aligned with the Ministry of Road Transport and Highways’ (MoRTH) vision of seamless, cashless travel. The proposal not only promises to save fuel and time but is also designed to reduce the environmental impact of long vehicle queues at toll plazas.

Govt Plans Toll Booth Removal on Highways: New Update for October 2025

Get Latest Updates Join Now

What the Toll Booth Removal Plan Includes

The highway toll removal plan India includes replacing physical toll booths with an advanced GPS-based toll collection system. This will track vehicle movement through satellite technology and deduct the toll amount automatically from the registered account.

Key features of the proposed toll plan include:

  • Elimination of manual and RFID-based toll plazas

  • Satellite tolling integrated with vehicle FASTag IDs

  • Real-time traffic analytics for better monitoring

  • Automatic deduction through linked bank or wallet

This national highways update is a part of India’s larger goal to implement intelligent traffic management systems on all major routes.

Highways Under Consideration

The pilot phase is expected to cover select national corridors that face high traffic congestion and maintenance costs. Here’s a table showing the likely candidates for the first phase:

Highway States Covered Avg Toll Booths per 100 km Eligible for GPS Toll
Delhi-Mumbai Expressway Delhi, Rajasthan, MP 3 Yes
Bengaluru–Chennai Corridor Karnataka, Tamil Nadu 2 Yes
Lucknow–Kanpur Highway Uttar Pradesh 4 Under Review
Eastern Peripheral Expressway Haryana, UP 3 Yes

These routes have been selected based on high vehicle volume, commuter complaints, and feasibility of integrating GPS tolling infrastructure.

Benefits of the New Tolling System

The highway toll removal plan India is being welcomed by logistics providers, daily commuters, and infrastructure developers. Removing physical toll barriers can help:

  • Cut waiting time at toll booths

  • Reduce fuel wastage and vehicle emissions

  • Lower administrative and labor costs for toll management

  • Enable dynamic toll pricing based on traffic and time

This national highways update could potentially save crores in fuel and time losses each year, while also making highways safer and more efficient for long-distance travel.

Concerns and Infrastructure Challenges

Despite the excitement, implementation comes with its own set of challenges. Integrating GPS-based tolling requires:

  • Equipping all vehicles with satellite tracking devices

  • Synchronizing FASTag with GPS and payment systems

  • Strengthening data privacy and fraud protection measures

  • Ensuring consistent connectivity in remote highway stretches

The highway toll removal plan India is currently under detailed review with technology partners and NHAI to finalize these technical prerequisites before mass rollout.

Timeline and What to Expect in October 2025

According to sources in the MoRTH, the final framework will be ready by August 2025, with phased implementation beginning October. The ministry is also expected to launch a public awareness campaign to educate vehicle owners about the new system.

For travelers and transporters, this national highways update means:

  • Fewer interruptions during journeys

  • Reduced human error in toll collection

  • Transparent and automated billing

  • Integration of travel logs for commercial fleets

Once implemented, the system could revolutionize India’s national highways and serve as a model for other developing economies.

Conclusion

The proposed highway toll removal plan India marks a transformative step toward smart mobility and infrastructure development. With the first rollout phase set for October 2025, India is moving closer to adopting efficient, tech-driven solutions on its national highways. This national highways update could not only make travel faster and more convenient but also lay the foundation for the future of intelligent transport systems in the country.

FAQs

What is the main objective of the highway toll removal plan India?

The objective is to improve traffic flow and reduce environmental impact by removing physical toll booths and implementing a GPS-based tolling system.

Will all toll booths be removed by October 2025?

Only select highways will be included in the first phase, as per the official national highways update, with broader implementation planned over the next year.

How will toll be collected without toll booths?

Toll charges will be automatically deducted using GPS tracking and FASTag integration, based on the distance traveled on national highways.

Will I need any new device in my car?

Yes, vehicle owners may need to install a satellite-based GPS tracker compatible with the new tolling system, as part of the highway toll removal plan India.

Click here to learn more

Leave a Comment